Труды КНЦ (Технические науки) 2/2022(13).
Список источников 1. Fathollahzadeh K. et al. A mathematical model for open pit mine production scheduling with Grade Engineering and stockpiling // International Journal of Mining Science and Technology. 2021. Vol. 31 (4). P. 717-728. 2. Alipour A. et al. An integrated approach to open-pit mines production scheduling // Resources Policy. 2022. Vol. 75. 102459. 3. Tolouei K. et al. An optimisation approach for uncertainty-based long-term production scheduling in open-pit mines using meta-heuristic algorithms // International Journal of Mining Reclamation and Environment. 2021. Vol. 35. P. 1-26. 4. Alipour A. et al. Production scheduling of open-pit mines using genetic algorithm: a case study // International Journal of Management Science and Engineering Management. 2019. Vol. 15. P. 1-8. 5. Espinoza D. et al. Minelib 2011: A library of open pit production scheduling problems // Annals of Operations Research. 2013. Vol. 206 (1). P. 91-114. 6. Russel S., Norvig P. Artificial Intelligence: A Modern Approach. 3rd edition. Prentice Hall, 2010. 1132 p. 7. Zuenko A. et al. A method for solving the open-pit mine production scheduling problem using the constraint programming paradigm // Journal of Physics: Conference Series. 2021. Vol. 2060. P. 12-21. 8. Зуенко А. А., Олейник Ю. А., Македонов Р. А. Интеллектуальный поиск точных решений задачи планирования открытых горных работ // Системы анализа и обработки данных. 2021. Вып. 3 (83). С. 99-114. References 1. Fathollahzadeh K., Mardaneh E., Cigla M., Asad M. A mathematical model for open pit mine production scheduling with Grade Engineering and stockpiling. International Journal o f Mining Science and Technology, 2021, vol. 31, no. 4, pp. 717-728. 2. Alipour A., Khodaiari A., Jafari A., Tavakkoli-Moghaddam R. An integrated approach to open-pit mines production scheduling. Resources Policy, 2022, vol. 75, 102459. 3. Tolouei K., Moosavi E., Tabrizi A., Afzal P., Bazzazi A. An optimisation approach for uncertainty- based long-term production scheduling in open-pit mines using meta-heuristic algorithms. International Journal o fMining Reclamation and Environment, 2021, vol. 35, pp. 1-26. 4. Alipour A., Khodaiari A., Jafari A., Tavakkoli-Moghaddam R. Production scheduling of open-pit mines using genetic algorithm: a case study. International Journal o fManagement Science and Engineering Management, 2019, vol. 15, pp. 1-8. 5. Espinoza D., Goycoolea M., Moreno E., Newman A. Minelib 2011: A library of open pit production scheduling problems. Annals o f Operations Research, 2013, vol. 206, no. 1, pp. 91-114. 6. Russel S., Norvig P. Artificial Intelligence: A Modern Approach. 3rd edition. Prentice Hall, 2010, 1132 p. 7. Zuenko A., Oleynik Y., Makedonov R. A method for solving the open-pit mine production scheduling problem using the constraint programming paradigm. Journal o f Physics: Conference Series , 2021, vol. 2060, pp. 12-21. 8. Zuenko A. A., Oleynik Y. A., Makedonov R. A. Intellektual'nyj poisk tochnyh reshenij zadachi planirovaniya otkrytyh gornyh rabot [AI search of the exact solutions of open-pit mine scheduling problem]. Sistemy analiza i obrabotki dannyh [Analysis and data processing systems], 2021, vol. 3, n o .83, p p .99-114. Информация об авторах Ю . А . Олейник — младший научный сотрудник; А. А. Зуенко — кандидат технических наук, ведущий научный сотрудник. Information about the authors Y. A. O leynik — Junior Researcher; A. A. Zuenko — Candidate o f Science (Tech.), Leading Researcher. Статья поступила в редакцию 19.10.2022; одобрена после рецензирования 07.11.2022; принята к публикации 16.11.2022. The article was submitted 19.10.2022; approved after reviewing 07.11.2022; acceptedfor publication 16.11.2022. Труды Кольского научного центра РАН. Серия: Технические науки. 2022. Т. 13, № 2. С. 111-115. Transactions of the Kola Science Centre of RAS. Series: Engineering Sciences. 2022. Vol. 13, No. 2. P. 111-115. © Олейник Ю. А., Зуенко А. А., 2022 115
Made with FlippingBook
RkJQdWJsaXNoZXIy MTUzNzYz